Perseverance Is Worth It

On 28th December 2014, I finally received an e-mail from Pyongyang that I had long been waiting for. Our chief wind engineer of the Alternative Energy Center, reported the following: “On 18th December we received all the material for the wind turbine that you ordered and organized for us and are extremely thankful!” But the story behind this short note began a year and a half earlier.

During a summer thunderstorm in Samhun our first self-constructed 2000-watt wind turbine was struck by lightning, damaging the generator. The farm manager and his team tried to repair the generator but had to succumb to the fact that this was not doable on the 15 m high tower of the wind turbine. They had to demount the damaged generator and transport it to the repair shop in the valley. Unfortunately, the generator fell to the ground, which broke the permanent magnets. The Alternative Energy Center asked us to order a backup generator from the manufacturer in Inner Mongolia, China. No sooner said than done, I ordered two generators while I was at it. Two months later the new generators were ready to be delivered. And then the long saga began: For months nothing happened with the first export agency because it was not clear if there were any export regulations from China that would forbid the import of wind generators to North Korea. Nothing came of the efforts of the Alternative Energy Center to drive to the border and pick up the two 35-kg generators to reduce the extremely high import costs. Winter came, then spring and summer again. During our last visit to Pyongyang in June 2014 we could finally clarify some open questions and figure out what was just rumor and what the actual export and import obstacles were. I devoted myself to the problem with new motivation and full of energy because another wind turbine (1kW) was promised for the new wind test field. Quite soon I found another supplier and looked for an importer myself. Thanks to the help of a friend this worked out and finally all the material, the generators and the tower were delivered to the border in Dandong, China. Shortly thereafter though, in November 2014, the border was closed due to Ebola restrictions and everything was up in the air again. All the more exciting was the message shortly before the New Year that everything had arrived at the Alternative Energy Center. Mr. Jang assured us: “We are preparing the installation of the wind turbines and hope to spread the knowledge of wind power in the rest of the country. I wish to thank you for all you have done for us!”

Advertisements

2 thoughts on “Perseverance Is Worth It

Add yours

    1. We are supporting the experts of the Renewable Energy Center with know-how and training in-country and abroad so that they can sucessfully do their task to spread the knowledge of using renewable energy and be energy efficient in the whole country.

Leave a Reply to Stanito Cancel reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

Up ↑

%d bloggers like this: